England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 2 — Buildings other than dwellings
Energy performance guidance for non-domestic buildings, covering fabric, services, controls and commissioning.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 2; later editions and transitions on source page
- Search coverage
- 116 of 116 PDF pages · 2 OCR pages
Energy & sustainability
Open original PDF at page 103 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
O N L I N E V E R S I O N C
Appendix C: Reporting evidence of compliance
BRUKL report
C1 The Building Regulations UK Part L (BRUKL) report should be provided to the building control
body and to the building owner to show that building work complies with the energy efficiency
requirements.
C2 The Simplified Building Energy Model (SBEM) will produce the BRUKL report for the building as a
standard output option.
C3 Two versions of the BRUKL report should be produced, using the approved software.
a. The first, the design stage BRUKL report, before works begin, to include all of the following.
i. The target primary energy rate and building primary energy rate.
ii. The target emission rate and building emission rate.
iii. A supporting list of specifications.
b. The second, the as-built BRUKL report, to include all of the following.
i. The target primary energy rate and as-built building primary energy rate.
ii. The target emission rate and as-built building emission rate.
iii. A supporting list of specifications and any changes to the list of specifications that was
provided at design stage.
The building control body can then use these reports to help check that what was designed has been
built. The software includes a facility to compare the design stage and as-built data input files and
automatically produces a schedule of changes.
C4 The as-built BRUKL report should be signed by the energy assessor to confirm that the as-built
calculations are accurate.
C5 The as-built BRUKL report must be signed by the client (usually the developer or housebuilder) to
confirm that the building has been constructed or completed according to the specifications in the
report.
93
Building Regulations 2010 Approved Document L Volume 2, 2021 edition