England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 2 — Buildings other than dwellings
Energy performance guidance for non-domestic buildings, covering fabric, services, controls and commissioning.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 2; later editions and transitions on source page
- Search coverage
- 116 of 116 PDF pages · 2 OCR pages
Energy & sustainability
Open original PDF at page 16 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
R24-27C O N L I N E V E R S I O N
Regulations 24, 25, 25B, 26, 26C, 27 and 27C:
Energy performance of building calculations
This section deals with the requirements of regulations 24, 25, 25B, 26, 26C, 27 and 27C of the Building
Regulations 2010.
Regulations
Methodology of calculation of the energy performance
24. (1) The Secretary of State shall approve—
(a) a methodology of calculation of the energy performance of buildings, including methods for calculating
asset ratings and operational ratings of buildings; and
(b) ways in which the energy performance of buildings, as calculated in accordance with the methodology,
shall be expressed.
(2) In this regulation—
“ asset rating” means an energy performance indicator determined from the amount of energy estimated to
meet the different needs associated with a standardised use of the building; and
“ operational rating” means an energy performance indicator determined from the amount of energy
consumed during the occupation of a building over a period of time and the energy demand associated
with a typical use of the building over that period.
Minimum energy performance requirements for new buildings
25. M inimum energy performance requirements shall be approved by the Secretary of State, calculated and
expressed in accordance with the methodology approved pursuant to regulation 24, for—
(a) new buildings (which shall include new dwellings), in the form of target CO emission rates;
2
(b) new dwellings, in the form of target fabric efficiency rates, and
(c) new buildings in the form of target primary energy rates.
Nearly zero-energy requirements for new buildings
25B. Where a building is erected, it must be a nearly zero-energy building.
CO emission rates for new buildings
2
26. W here a building is erected, it shall not exceed the target CO emission rate for the building that has been
2
approved pursuant to regulation 25, applying the methodology of calculation and expression of the energy
performance of buildings approved pursuant to regulation 24.
Target primary energy rates for new buildings
26C. W here a building is erected it must not exceed the target primary energy rate for the building which has been
approved pursuant to regulation 25(c), applying the methodology of calculation and expression of the energy
performance of buildings approved pursuant to regulation 24.
6
Approved Document L Volume 2, 2021 edition Building Regulations 2010
O N L I N E V E R S I O N
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.