England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 2 — Buildings other than dwellings
Energy performance guidance for non-domestic buildings, covering fabric, services, controls and commissioning.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 2; later editions and transitions on source page
- Search coverage
- 116 of 116 PDF pages · 2 OCR pages
Energy & sustainability
Open original PDF at page 28 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
R25A O N L I N E V E R S I O N
Regulation 25A: Consideration of high-
efficiency alternative systems
This section deals with the requirements of regulation 25A of the Building Regulations 2010.
Regulation
Consideration of high-efficiency alternative systems for new buildings
25A. (1) Before construction of a new building starts, the person who is to carry out the work must analyse and
take into account the technical, environmental and economic feasibility of using high-efficiency alternative
systems (such as the following systems) in the construction, if available—
(a) d ecentralised energy supply systems based on energy from renewable sources;
(b) cogeneration;
(c) d istrict or block heating or cooling, particularly where it is based entirely or partially on energy from
renewable sources; and
(d) heat pumps.
(2) The person carrying out the work must—
(a) not later than the beginning of the day before the day on which the work starts, give the local authority
a notice which states that the analysis referred to in paragraph (1)—
(i) has been undertaken;
(ii) is documented; and
(iii) the documentation is available to the authority for verification purposes; and
(b) e nsure that a copy of the analysis is available for inspection at all reasonable times upon request by an
officer of the local authority.
(3) A n authorised officer of the local authority may require production of the documentation in order to verify
that this regulation has been complied with.
(4) The analysis referred to in paragraph (1)—
(a) m ay be carried out for individual buildings or for groups of similar buildings or for common typologies
of buildings in the same area; and
(b) i n so far as it relates to collective heating and cooling systems, may be carried out for all buildings
connected to the system in the same area.
18
Approved Document L Volume 2, 2021 edition Building Regulations 2010
O N L I N E V E R S I O N
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.