O N L I N E V E R S I O N L1(a) Table 4.2 Limiting U-values for new fabric elements in existing dwellings Element type Maximum U-value(1) W/(m2·K) Roof(2) 0.15 Wall(2)(3) 0.18 Floor(4)(5) 0.18 Swimming pool basin(6) 0.25 Window(7)(8)(9) 1.4 or Window Energy Rating(10) Band B minimum Rooflight(11)(12) 2.2 Doors with >60% of internal face glazed(13) 1.4 or Doorset Energy Rating(10) Band C minimum Other doors(13)(14) 1.4 or Doorset Energy Rating(10) Band B minimum NOTES: 1. Area-weighted average values, except for windows, doors, roof windows and rooflights. 2. For dormer windows, ‘roof’ includes the roof parts of the windows and ‘wall’ includes the wall parts (cheeks). 3. If meeting such a standard would reduce the internal floor area of the room bounded by the wall by more than 5%, a lesser provision may be appropriate. 4. If meeting such a standard would create significant problems in relation to adjoining floor levels, a lesser provision may be appropriate. 5. The U-value of the floor of an extension may be calculated using the exposed perimeter and floor area of the whole enlarged dwelling. 6. The U-value of a swimming pool basin (walls and floor) calculated according to BS EN ISO 13370. 7. If other performance (e.g. wind load, safety, security or acoustic attenuation) requires thicker glass to be used, an equivalent window unit with standard thickness (6mm) glazing should be shown to meet the required standard. 8. Including roof windows and curtain walling. 9. For timber windows, a maximum U-value of 1.6 W/(m2·K) or Window Energy Rating Band C is permissible until 14 June 2023. This is to give manufacturers time to transition to the standard in this Table 4.2. From 15 June 2023 the full standard of 1.4 W/(m2·K) or Window Energy Rating Band B applies. 10. The methods for calculating Window Energy Rating and Doorset Energy Rating are set out in the Glass and Glazing Federation’s Glazing Manual Data Sheet 2.3, Guide to the Calculation of Energy Ratings for Windows, Roof Windows and Doors. 11. U-values for rooflights or rooflight-and-kerb assemblies should be based on the outer developed surface area, which is often greater than the area of the roof opening. Further guidance on U -values is given in the Building Research d Establishment’s BR 443 and the National Association of Rooflight Manufacturers’ Technical Document NTD02. 12. The limiting value for rooflights also applies to kerbs that are supplied as part of a single rooflight-and-kerb assembly sourced from the same supplier and for which the supplier can provide a combined U -value for the d assembly. An upstand built on site should have a maximum U-value of 0.35W/(m2·K). 13. For timber doors, a maximum U-value of 1.8 W/(m2·K) or Doorset Energy Rating Band E is permissible until 14 June 2023. This is to give manufacturers time to transition to the standard in this Table 4.2. From 15 June 2023 the full standard of 1.4 W/(m2·K) applies. 14. For external fire doorsets, as defined in Appendix A of Approved Document B, Volume 1, a maximum U-value of 1.8W/(m2·K) is permissible. Renovated and retained elements 4.11 The U-value of an existing thermal element that is being renovated should both: a. be no worse than that of the element before it was renovated b. meet the limiting standards in Table 4.3. 4.12 Guidance on when an existing element should meet the standards in Table 4.3 is given in Section 11. Elements that should meet the standards include both of the following. a. Thermal elements being renovated in existing dwellings. Renovated elements should achieve the U-values in Table 4.3, column (b). Building Regulations 2010 Approved Document L Volume 1, 2021 edition 25 O N L I N E V E R S I O N

Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.