Conservation of fuel and power: Approved Document L, Volume 1 — Dwellings

Building regulation guidance on energy efficiency and the conservation of fuel and power.

Energy & sustainability
Open original PDF at page 39

Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.

O N L I N E V E R S I O N L1(a) h. Windows: designs should minimise thermal bridging. i. Lintels: consider using independent lintels with an insulated cavity closure between the inner and outer lintel. For common leaf lintels, the base plate should not be continuous and the lintel core should be insulated. ii. Insulated cavity closers should be used for all construction types. Additionally, insulated plasterboard should be used in reveals to abut jambs and should be considered within reveal soffits. i. Roofs: continue the insulation across the wall-to-eaves and wall-to-gable junctions. i. Wall insulation should be installed to the top of the wall plate; in some places, such as the eaves, this may be above the cavity closure or barrier. In all cases, roof insulation should be continuous with wall insulation. ii. Roofs insulated at ceiling level: loft insulation at the eaves should extend beyond the wall insulation without any reduction in thickness due to the pitch of the roof. The roof insulation should be installed when the eaves are still accessible. At gables and party walls, insulation should extend to the wall; if the space between the wall and joist is less than 100mm, perimeter insulation may be required. iii. Roofs insulated at rafter level: at the eaves, insulation should extend to the top of the external wall. Voids between insulation at the top of the external wall and the cavity wall/ timber frame insulation should be fully filled with insulation. NOTE: Any solution to edge sealing or thermal bridging in new dwellings should take account of Part E of the Building Regulations. 4.18 Thermal bridges should be assessed in a new dwelling using one of the following methods. a. Use construction joint details calculated by a suitably competent person following the guidance in the Building Research Establishment’s BR 497 and the temperature factors set out in the Building Research Establishment’s Information Paper 1/06. b. Use junction details from a reputable non-government database containing independently assessed thermal junction details, such as Local Authority Building Control’s Construction Details library. c. Use the values in the Standard Assessment Procedure, Table K1. A mixture of known and default values may be used. d. Use a default y-value of 0.20W/(m2.K). NOTE: A mix of approaches may be used for different elements on the same dwelling. When using the approach in (a) or (b) above, an appropriate system of site inspection should be in place. Thermal bridging in existing dwellings 4.19 When carrying out work in existing dwellings, care should be taken to reduce unwanted heat loss through thermal bridging. Thermal bridges can be limited in an existing dwelling by following the junction details from a reputable non-government database containing independently assessed thermal junction details, such as Local Authority Building Control’s Construction Details library. Follow the guidance in paragraph 4.17 where appropriate. Building Regulations 2010 Approved Document L Volume 1, 2021 edition 29 O N L I N E V E R S I O N

Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.