A1/2
THICKNESS OF WALLS IN CERTAIN SMALL BUILDINGS
Diagram 7 Maximum height of buildings
Find the orographic
zone for the site from Obtain maximum
Obtain value Calculate value
Figure 2 Diagram 6 and allowable
of Factor A of Factor S from:
obtain Factor O from building height
from Table b S = V × O × A
Table a (or use Figure 3 from Table c
Diagram 6)
Table a Factor O
Orographic category and average slope of whole Factor O
hillside, ridge, cliff or escarpment Zone 1 Zone 2 Zone 3
0 1.00
Category 1: Nominally flat terrain, average slope < 1/20 1.0 1.0 1.0 50 1.05
Category 2: Shallow terrain, average slope < 1/10 1.12 1.07 1.05 100 1.10
Category 3: Moderately steep terrain, average slope < 1/5 1.24 1.13 1.10 150 1.15
Category 4: Steep terrain, average slope > 1/5 1.36 1.20 1.15 200 1.20
300 1.30
400 1.40
500 1.50
Table c Maximum allowable building height in metres
S < 2km 2 to 20km > 50km < 2km 2 to 20km > 50km
≤ 25 15 15 15 15 15 15
26 11.5 13.5 15 15 15 15
27 8 11 14.5 15 15 15
28 5.5 8 11 15 15 15
29 4 6.5 8.5 12.5 15 15
30 3 5 6.5 10 12.5 15
31 4 5.5 8.5 11 13.5
32 3.5 4.5 7 9.5 11.5
33 3 3.5 6 8 10
34 3 5.5 7 87.5
35 4.5 6.5 7.5
36 4 5.5 6.5
37 3.5 5 6
38 3 4.5 5.5
39 4 5
40 3.5 4.5
41 3 4
42 3.5
43 3.5
44 3
Notes: Table a – Outside of the zones shown in Table a, Factor O = 1.0.
Table b – For elevated sites where orography is significant a more accurate assessment of Factor A can be
obtained by using the altitude at the base of the topographic feature instead of the altitude at the site,
see Figure 2 Diagram 6 or, alternatively, Figure 3 Diagram 6.
Table c – i) Sites in town less than 300m from the edge of the town should be assumed to be in country terrain.
ii) Where a site is closer than 1km to an inland area of water which extends more than 1km in the wind
direction, the distance to the coast should be taken as < 2km.
Interpolation may be used in Tables b and c.