Ventilation
Open original PDF at page 24 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
F1(1) O N L I N E V E R S I O N
Purge ventilation
1.59 For purge ventilation, follow paragraphs 1.26 to 1.31.
Continuous mechanical extract ventilation
1.60 A continuous mechanical extract ventilation system could consist of one of the following.
a. A central extract system.
b. Individual room extract fans.
c. A combination of a central extract system and individual room extract fans.
1.61 If an exhaust air terminal is located on a façade that is exposed to the prevailing wind, measures
should be taken to minimise likely wind effects. Solutions could include the following.
a. Ducting to another façade.
b. Use of constant volume flow rate units.
c. Seeking expert advice.
Ventilation rates
1.62 The total combined rate of continuous mechanical extract ventilation in the dwelling should be at
least the whole dwelling ventilation rate in Table 1.3.
1.63 Each wet room should have a minimum continuous mechanical extract ventilation high rate as given
in Table 1.2.
Background ventilators for continuous mechanical extract ventilation
1.64 Where continuous mechanical extract ventilation is used, background ventilators should satisfy all
of the following conditions.
a. Not be in wet rooms.
b. Provide a minimum equivalent area of 4000mm2 for each habitable room in the dwelling.
c. Provide a minimum total number of ventilators that is the same as the number of bedrooms plus
two ventilators (i.e. a one-bedroom dwelling should have three background ventilators, a two-
bedroom dwelling should have four background ventilators, etc.).
1.65 If a habitable room has no external walls, paragraphs 1.42 to 1.44 should be followed.
Purge ventilation
1.66 For purge ventilation, follow paragraphs 1.26 to 1.31.
Mechanical ventilation with heat recovery
Ventilation rates
1.67 For dwellings using mechanical ventilation with heat recovery, each habitable room should have
mechanical supply ventilation. The total supply air flow should be distributed proportionately to
the volume of each habitable room.
1.68 Mechanical supply terminals should be located and directed to avoid draughts.
1.69 The minimum total continuous rate of mechanical ventilation with heat recovery is the whole
dwelling ventilation rate in Table 1.3.
16