New Zealand · Acceptable Solution
B1/AS1: Structural provisions for buildings
Acceptable Solution B1/AS1 for structural provisions within its stated scope under clause B1 of the New Zealand Building Code.
- Edition
- Second edition · effective 28 July 2025
- Search coverage
- 21 of 21 PDF pages
Structure
Open original PDF at page 8 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
B1 STRUCTURE ACCEPTABLE SOLUTION B1/AS1
Buildings and structures
2.3.3 Definitions
2.3.3.1 In NZS 3604 Clause 1.3 Definitions for:
a) Good Ground, add “liquefaction, lateral spread” after “subsidence” in subparagraph (c);
and
b) Bracing rating, remove “when tested in accordance with BRANZ Technical Paper P21”
2.3.4 Bracing design
2.3.4.1 In NZS 3604, make the following modifications in Section 5 Bracing Design:
a) modify Figure 5.4 Earthquake zones, so that all the area within the Christchurch City Council
boundary is within Zone 2; and
b) modify Figure 5.4 Earthquake zones, so that the lowest zone within the Selwyn or
Waimakariri District Council boundaries is within Zone 2. Areas within Selwyn District that
are designated as Zone 1 in NZS 3604 shall become Zone 2.
2.3.4.2 In NZS 3604, where the bracing rating or bracing capacity of timber framed wall bracing
elements must be determined, such as in Clauses 5.4 and 8.3.1, the bracing rating shall be
determined in accordance with Subsection 3.5.3 of the Building Product Specifications.
2.3.5 Timber piles
2.3.5.1 Where timber piles are used in accordance with NZS 3604, they shall comply with
Subsection 2.1.2 of the Building Product Specifications.
2.3.6 Timber decks
2.3.6.1 Remove Subclause 7.4.1.3 (c) in NZS 3604.
2.3.6.2 Modify Figure 7.10 (b) in NZS 3604 as follows:
a) on the plan view replace the text “2/M12 x 250 mm coach screws at 140 crs” with “2/M12 x
240 mm coach screws at 140 crs vertically.”; and
b) on the plan view replace “2/M12 at 400 crs” twice with “2 M12 bolts at 140crs vertically to
capture end joist laminations and blocking, and boundary joist laminations and blocking, at
post centrelines.”; and
c) add to Note 3: “All coach screws to have 50 x 50 washers.”
2.3.6.3 Modify Figure 7.10 (c) in NZS 3604 as follows:
a) on the plan view, add the text “At each strap location (at joist ends and nogging), 2/M12 x
240 mm long coach screws are required.”; and
b) on the plan view, replace the text “2/M12 x 250 mm coach screws at 140 crs vertically” with
“ 2/M12 x 200mm coach screws at 140 crs vertically” ; and
c) on the section view, replace the text “M12 x 200 mm coach screws at 400 crs vertically” with
M12 x 240 mm coach screws at 140 crs vertically”; and
d) remove “2/M12 bolts at 400crs” which tie laminations together along edge joists and along
boundary joists.
2.3.7 Concrete slab-on-ground floors
2.3.7.1 For foundation and edge details for concrete slab-on-ground floors, make the following
modifications in Clause 7.5.2 in NZS 3604:
a) replace Clause 7.5.2.3 with:
i) “Clause 7.5.2.3 The combined foundation and edge details shall be constructed as
shown in Figures 7.13(B), 7.14(B) or (C) (and Figures 7.15(B) and 7.16(B) or (C) for
foundations supporting a masonry veneer).”; and
MINISTRY OF BUSINESS, INNOVATION AND EMPLOYMENT 28 JULY 2025 Page 8
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.