England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 2 — Buildings other than dwellings
Energy performance guidance for non-domestic buildings, covering fabric, services, controls and commissioning.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 2; later editions and transitions on source page
- Search coverage
- 116 of 116 PDF pages · 2 OCR pages
Energy & sustainability
Open original PDF at page 23 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
O N L I N E V E R S I O N R24-27C
Table 2.1 Enhanced management and control features
Feature Adjustment factor
Automatic monitoring and targeting with alarms for out-of-range values(1) 0.050
Power factor correction to achieve a whole building power factor >0.90(2) 0.010
Power factor correction to achieve a whole building power factor >0.95(2) 0.025
NOTES:
1. This means a complete installation that measures, records, transmits, analyses, reports and communicates
meaningful energy management information to enable the operator to manage the energy it uses. A building
automation and control system specified following paragraphs 6.66 to 6.73 would meet this definition.
2. The power factor adjustment can be made only if the whole building power factor is corrected to achieve the
value in this table (>90 or >0.95). The two levels of power factor correction are alternative values, not additive.
Achieving the target primary energy rate and target
emission rate
2.9 Provided the building satisfies the minimum standards for fabric elements set out in Section 4,
the designer can achieve the target primary energy rate and target emission rate by using any
combination of the following.
a. Fabric energy efficiency.
b. Efficient building services.
c. Low and zero carbon technologies integrated in an appropriate mix.
NOTE: The target primary energy rate and target emission rate are not likely to be met by using the
minimum standards for fabric set out in Section 4 alone.
Special considerations when calculating building primary
energy rate and building emission rate
2.10 Special considerations may apply to certain classes of building. These building types include all of
the following.
a. Modular and portable buildings with a planned service life of more than two years (at one or
more sites), follow paragraphs 2.11 to 2.19.
b. Swimming pools, follow paragraph 2.20.
c. Shell and core developments, follow paragraphs 2.21 to 2.25.
d. Industrial sites, workshops and non-residential agricultural buildings, follow paragraph 2.26.
e. Buildings with low energy demand, follow paragraphs 2.27 to 2.32.
NOTE: Industrial sites, workshops and non-residential agricultural buildings with low energy
demand and buildings with a planned service life of less than two years are exempt from the
energy efficiency requirements. See paragraph 0.11.
13
Building Regulations 2010 Approved Document L Volume 2, 2021 edition
O N L I N E V E R S I O N
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.