England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 2 — Buildings other than dwellings
Energy performance guidance for non-domestic buildings, covering fabric, services, controls and commissioning.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 2; later editions and transitions on source page
- Search coverage
- 116 of 116 PDF pages · 2 OCR pages
Energy & sustainability
Open original PDF at page 98 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
AA O N L I N E V E R S I O N
Luminaire lumens Equal to (light source lumens Modulating burner control A type of boiler
� light output ratio) and represents the output of control that provides a continuously variable firing
the luminaire. Light output ratio (LOR) is the ratio rate that is altered to match the boiler load over
of the output of the luminaire at stated practical the whole turndown ratio.
conditions to that of the lamp(s) contained in the
Optimum start A control system or algorithm that
luminaire under reference conditions.
starts plant operating at the latest time possible
*Major renovation Defined in regulation 35 as to achieve specified conditions at the start of the
the renovation of a building where more than occupancy period.
25% of the surface area of the building envelope
Optimum stop A control system or algorithm that
undergoes renovation.
stops plant operating at the earliest time possible
*Material change of use Defined in regulation 5 as: so that internal conditions will not deteriorate
Where there is a change in the purposes for which beyond present limits by the end of the occupancy
or the circumstances in which a building is used, so period.
that after that change:
Part load energy efficiency ratio A ratio calculated
a. the building is used as a dwelling, where by dividing the cooling energy delivered into
previously it was not; the cooling system by the energy input to the
cooling plant. Part load performance for individual
b. the building contains a flat, where previously it
chillers is determined assuming that chilled water
did not;
is provided at 7°C out and 12°C in (at 100% load),
c. the building is used as an hotel or a boarding under the conditions detailed in Table A2.
house, where previously it was not;
d. the building is used as an institution, where Table A2 P artial load efficiency ratio
previously it was not;
Percentage part load 25% 50% 75% 100%
e. the building is used as a public building, where
previously it was not; Air-cooled chiller’s 20 25 30 35
ambient air temperature
f. the building is not a building described in (°C)
classes 1 to 6 in Schedule 2, where previously it
Water-cooled chiller’s 18 22 26 30
was;
entering cooling water
temperature (°C)
g. the building, which contains at least one
dwelling, contains a greater or lesser number of
Point-of-use electrically heated A domestic hot
dwellings than it did previously;
water system in which the water is supplied to
h. the building contains a room for residential
the draw-off points from a device in which water
purposes, where previously it did not;
is heated by an electric element or elements
i. the building, which contains at least one room immersed in the stored water. The water heater
for residential purposes, contains a greater is close to the draw-off points and has a storage
or lesser number of such rooms than it did capacity no greater than 100 litres.
previously;
Power efficiency The total annual power output of
j. the building is used as a shop, where it a CHP unit divided by its total annual fuel input.
previously was not; or
Primary energy Energy, from renewable and non-
k. the building is a building described in regulation renewable sources, that has not undergone any
7(4)(a), where previously it was not. conversion or transformation process.
8888
AApppprroovveedd DDooccuummeenntt LL VVoolluummee 22,, 22002211 eeddiittiioonn BBuuiillddiinngg RReegguullaattiioonnss 22001100
O N L I N E V E R S I O N
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.