England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 1 — Dwellings
Building regulation guidance on energy efficiency and the conservation of fuel and power.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 1; later editions and transitions on source page
- Search coverage
- 104 of 104 PDF pages · 3 OCR pages
Energy & sustainability
Open original PDF at page 90 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
O N L I N E V E R S I O N
C
Appendix C: Work to thermal elements
C1 This appendix provides guidance on the cost-effectiveness of insulation measures during various
types of work on a thermal element. Table C1 sets out target U-values that would be considered
to represent reasonable improvements in ordinary cases and examples of construction that may be
used to achieve the proposed performance.
C2 If it is not reasonable to meet the target U-values in Table C1, considering technical risk and
practicality of the work in relation to the dwelling and impacts on adjoining buildings, then the
U-value should be as close to the target value as practically possible.
C3 The final column in Table C1 provides guidance on specific issues that may need to be considered
to determine an appropriate course of action. In general, the proposed works should take account
of all of the following.
a. The requirements of any other relevant parts of Schedule 1 to the Building Regulations.
b. The general guidance on technical risk relating to insulation improvements contained in the
Building Research Establishment’s BR 262.
c. For buildings falling within the categories set out in paragraphs 0.8 to 0.13, Historic England’s
Energy Efficiency and Historic Buildings: Application of Part L of the Building Regulations to
Historic and Traditionally Constructed Buildings.
C4 General guidance is available from relevant British Standards.
Table C1 Cost-effective U-value targets when undertaking renovation works to thermal elements
Proposed works Target Typical construction Comments (reasonableness, practicability
U-value and cost-effectiveness)
W/(m2·K)
Pitched roof constructions
Renewal of roof covering: No 0.16 Provide loft Assess condensation risk in roof space and
living accommodation in the insulation – 250mm make appropriate provision in accordance
roof void. Existing insulation (if mineral fibre or with the requirements of Part C relating to
any) at ceiling level, less than cellulose fibre as a the control of condensation (BS 5250 and
50mm, in poor condition, and/ quilt laid between BS EN ISO 13788). Additional provision
or likely to be significantly and across ceiling may be required to provide access to and
disturbed or removed as part joists or loose fill or insulation of services in the roof void
of the planned work equivalent
Renewal of roof covering: 0.16 Top up loft Assess condensation risk in roof space
Existing insulation in good insulation to at least and make appropriate provision in line with
condition and will not be 250mm mineral fibre the requirements of Part C relating to the
significantly disturbed by or cellulose fibre as control of condensation (BS 5250 and
proposed works. Existing quilt laid between BS EN ISO 13788). Additional provision may
insulation thickness between and across ceiling be required to provide insulation and access
50mm and 100mm joists or loose fill or to services in the roof void
equivalent. This may
Where the loft is already boarded and the
be boarded out
boarding will not be removed as part of the
work, the practicality of insulation works
needs to be considered
80 Approved Document L Volume 1, 2021 edition Building Regulations 2010