England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 1 — Dwellings
Building regulation guidance on energy efficiency and the conservation of fuel and power.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 1; later editions and transitions on source page
- Search coverage
- 104 of 104 PDF pages · 3 OCR pages
Energy & sustainability
Open original PDF at page 91 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
O N L I N E V E R S I O N
AC
Table C1 Continued
Proposed works Target Typical construction Comments (reasonableness, practicability
U-value and cost-effectiveness)
W/(m2·K)
Renewal of the ceiling to cold 0.16 Provide loft Assess condensation risk in roof space and
loft space. Existing insulation insulation – 250mm make appropriate provision in accordance
at ceiling level will be removed mineral fibre or with the requirements of Part C relating to
as part of the works cellulose fibre as a the control of condensation (BS 5250 and
quilt laid between BS EN ISO 13788). Additional provision may
and across ceiling be required to provide insulation and access
joists or loose fill or to services in the roof void
equivalent. This may
Where the loft is already boarded and the
be boarded out
boarding will not be removed as part of the
work, insulation may be installed from the
underside; however, the target U-value may
not be achievable
Renewal of roof covering: 0.16 Cold structure – Assess condensation risk (particularly
Living accommodation in insulation (thickness interstitial condensation) and make
roof space (room-in-the-roof dependent on appropriate provision in accordance with
arrangement), with or without material) placed the requirements of Part C relating to the
dormer windows between and below control of condensation (BS 5250 and
rafters BS EN ISO 13788)
Warm structure – Where there is an increase in structural
insulation placed thickness (particularly in terraced dwellings),
between and above practical considerations may necessitate a
rafters lower performance target
Dormer window constructions
Renewal of cladding to side 0.30 Insulation (thickness Assess condensation risk and make
walls dependent on appropriate provision in accordance with
material) placed the requirements of Part C relating to the
between and/or control of condensation (BS 5250 and
fixed to outside of BS EN ISO 13788)
wall studs, or fully
external to existing
structure, depending
on construction
Renewal of roof covering – Follow the guidance Assess condensation risk and make
on pitched or flat appropriate provision in accordance with
roof constructions, the requirements of Part C relating to the
as appropriate control of condensation (BS 5250 and
BS EN ISO 13788)
Flat roof constructions
Renewal of roof covering: 0.16 Insulation placed Assess condensation risk and make
Existing insulation, if any, less between and over appropriate provision in accordance with
than 100mm, mineral fibre joists as required to the requirements of Part C relating to the
(or equivalent resistance) or achieve the target control of condensation (BS 5250 and
in poor condition, and likely U-value BS EN ISO 13788). Also see BS 6229 for
to be significantly disturbed design guidance
or removed as part of the
planned work
BBuuiillddiinngg RReegguullaattiioonnss 22001100 AApppprroovveedd DDooccuummeenntt LL VVoolluummee 11,, 22002211 eeddiittiioonn 8811
O N L I N E V E R S I O N
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.