England · Statutory guidance
Conservation of fuel and power: Approved Document L, Volume 1 — Dwellings
Building regulation guidance on energy efficiency and the conservation of fuel and power.
- Edition
- 2021 edition incorporating 2023 amendments · Volume 1; later editions and transitions on source page
- Search coverage
- 104 of 104 PDF pages · 3 OCR pages
Energy & sustainability
Open original PDF at page 92 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
O N L I N E V E R S I O N
AC
Table C1 Continued
Proposed works Target Typical construction Comments (reasonableness, practicability
U-value and cost-effectiveness)
W/(m2·K)
Renewal of the ceiling to flat 0.16 Insulation placed Assess condensation risk and make
roof area. Existing insulation between and to appropriate provision in accordance with
removed as part of the works underside of joists the requirements of Part C relating to the
to achieve target control of condensation (BS 5250 and
U-value BS EN ISO 13788). Also see BS 6229 for design
guidance.
Where insulation would unacceptably reduce
ceiling height, a lower performance target
may be appropriate
Solid wall constructions
Renewal of internal finish to 0.30 Dry-lining to inner Assess the impact on internal floor area. In
external wall or applying a face of wall – general it is reasonable to accept a reduction
finish for the first time insulation between not exceeding 5% in the area of a room.
studs fixed to wall However, the use of the room, and the space
to achieve target needed for people to move around and
U-value (thickness for fixtures, fittings and furniture should be
dependent on assessed
insulation and stud
If acoustic attenuation issues are particularly
material used)
important (e.g. where insulation is returned
Insulated wall board at party walls) a less demanding U-value may
fixed to internal be more appropriate – the target U-value
wall surface to may have to be increased to 0.35 or above,
achieve target depending on the circumstances
U-value (thickness
Assess condensation and other moisture
dependent on
risks and make appropriate provision in
material used)
accordance with the requirements of Part C
relating to the control of condensation
(BS 5250 and BS EN ISO 13788). This
will usually require the provision of
vapour control and damp protection
of components. Guidance on the risks
involved is provided in the Building Research
Establishment’s BR 262 and, on the technical
options, in Energy Saving Trust publications
Renewal of finish or cladding 0.30 External insulation Assess technical risk and impact of increased
to external wall area or system with wall thickness on adjoining buildings
elevation (render or other rendered finish or
cladding) or applying a finish cladding to give
or cladding for the first time target U-value
8822 AApppprroovveedd DDooccuummeenntt LL VVoolluummee 11,, 22002211 eeddiittiioonn BBuuiillddiinngg RReegguullaattiioonnss 22001100
O N L I N E V E R S I O N
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.