United States · ADA · Guidance
Guidance on the 2010 ADA Standards for Accessible Design
The Department of Justice’s explanation of changes to the ADA design standards, with section-by-section analysis and responses to public comments.
- Publisher
- U.S. Department of Justice
- Edition
- September 2010 guidance
- Search coverage
- 168 of 170 PDF pages · 4 OCR pages
AccessibilityAnthropometry & ergonomics
Open original PDF at page 17 Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.
Section 35.151 -- Title II Regulation
The purpose of the proposed six-month that the effective date be extended to at least
delay in requiring compliance with the 2010 18 months after the publication of the rule.
Standards was to allow covered entities a One of these commenters expressed con-
reasonable grace period to transition between cern that the kinds of bureaucratic organiza-
the existing and the proposed standards. For tions subject to the title II regulations lack
that reason, if a title II entity preferred to use the internal resources to quickly evaluate the
the 2010 Standards as the standard for new regulatory changes, determine whether they
construction or alterations commenced within are currently compliant with the 1991 stan-
the six-month period after the effective date dards, and determine what they have to do
of the final rule, such entity would be consid- to comply with the new standards. The other
ered in compliance with title II of the ADA. commenter argued that 18 months is the
minimum amount of time necessary to ensure
The Department received a number of that projects that have already been designed
comments about the proposed six-month and approved do not have to undergo costly
effective date for the title II regulation that design revisions at taxpayer expense.
were similar in content to those received on
this issue for the proposed title III regula- The Department is persuaded by the con-
tion. Several commenters supported the six- cerns raised by commenters for both the
month effective date. One commenter stated title II and III regulations that the six-month
that any revisions to its State building code compliance date proposed in the NPRM for
becomes effective six months after adop- application of the 2010 Standards may be
tion and that this has worked well. In addi- too short for certain projects that are already
tion, this commenter stated that since 2004 in the midst of the design and permitting
ADAAG is similar to IBC 2006 and ICC/ANSI process. The Department has determined
A117.1-2003, the transition should be easy. that for new construction and alterations,
By contrast, another commenter advocated compliance with the 2010 Standards will
for a minimum 12-month effective date, argu- not be required until 18 months from the
ing that a shorter effective date could cause date the final rule is published. Until the
substantial economic hardships to many cit- time compliance with the 2010 Standards is
ies and towns because of the lengthy lead required, public entities will have the option
time necessary for construction projects. of complying with the 2010 Standards, the
This commenter was concerned that a six- UFAS, or the 1991 Standards. However,
month effective date could lead to projects public entities that choose to comply with
having to be completely redrawn, rebid, and the 2010 Standards in lieu of the 1991
rescheduled to ensure compliance with the Standards or UFAS prior to the compliance
new standards. Other commenters advocated date described in this rule must choose
Department of Justice Guidance on 2010 Standards: Title II - 13
Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.