Conservation of fuel and power: Approved Document L, Volume 2 — Buildings other than dwellings

Energy performance guidance for non-domestic buildings, covering fabric, services, controls and commissioning.

Energy & sustainability
Open original PDF at page 72

Source wording and page order preserved. Drawings and table layouts remain available in the original PDF.

R44, R44ZO NAL I,N LE 1V(EbR S),I OLN2(b) Notice of completion 8.7 A commissioning notice must be given to the relevant building control body and the building owner confirming that commissioning has been carried out for the installed fixed building services and on-site electricity generation according to the procedures in this section. The notice should confirm all of the following. a. That the commissioning plan has been followed. b. That all systems have been inspected in an appropriate sequence and to a reasonable standard. c. That test results confirm that the performance of the system is reasonably in accordance with the actual building design, including written commentary on any areas where building services do not perform as well as intended. 8.8 The notice of completion of commissioning should be given as follows. a. If a building notice or full plans have been given to a local authority building control body, the notice should be given within five days of the commissioning work being completed. b. If the building control body is an approved inspector, the notice should generally be given to the approved inspector within five days of the work being completed. c. In other cases – for example, if the work is carried out by a person registered with a competent person scheme – the notice must be given to the building control body within 30 days of the work being completed. 8.9 Where fixed building services and on-site electricity generation that require commissioning are installed by a person registered with a competent person scheme, that person may give the notice of completion of commissioning. Air leakage testing of ductwork 8.10 For ducted systems that are served by fans with a design flow rate greater than 1m3/s, ductwork leakage tests should be carried out. Tests should follow the procedures in the Building and Engineering Services Association (BESA) documents DW/143 and DW/144. 8.11 For low-pressure ductwork, if at least 10% of the ductwork is tested at random and achieves the low-pressure standard as defined by DW/143, a calculated improvement in both the building primary energy rate and building emission rate may be claimed. Details are given in the National Calculation Methodology Modelling Guide. 8.12 Membership of the BESA Specialist Ductwork Group or the Association of Ductwork Contractors and Allied Services (ADCAS) is one way of demonstrating suitable competency for ductwork pressure testing work. 8.13 Air leakage rates are given in Table 8.1. If a ductwork system fails to meet the air leakage limit in Table 8.1, both of the following apply. a. Remedial work should be carried out to achieve satisfactory performance in retests. b. Further ductwork sections should be tested as set out in DW/143. 62 Approved Document L Volume 2, 2021 edition Building Regulations 2010 O N L I N E V E R S I O N

Edition and local adoption determine which requirements apply. Use the publisher’s document for the complete clauses, diagrams and amendments.